Additional transportation infrastructure is required to move cargo to and from the United States and Northern Canada. This project supports resource development in the North by mobilizing stranded commodities in regions within Alaska and Canada.

Our Railway

Constructing a railway from Alaska to Alberta will bring economic benefits to both countries, while kick-starting new economic momentum in the North. A2A Rail will link two highly successful regions (Southcentral Alaska ports and Fort McMurray) allowing for:

 

  • Dual-direction freight movement to and from North American destinations.
  • 24-hour a day operation applying the latest proven technologies in safety and efficiency to meet or exceed industry standards.
  • Transport of resource commodities from the North to global markets via the ports of Southcentral Alaska.
  • Increased access to historically inaccessible regions and resources creating opportunity throughout the region.

 

 

This icon has no website functionality.

Safety First

A2A Rail recognizes that safety is critical to the successful operation of modern-day railways. Whether transporting goods, commodities or people over short and long distances, safety must be the foremost consideration for communities, companies and governments.

 

 

This icon has no website functionality.

Our Pledge

A2A Rail commits to achieving the highest level of safety standards using the latest technology and industry innovations available. We will exceed industry-regulated standards and make A2A Rail a leader in construction, operational and maintenance safety standards in partnership with First Peoples.

This icon has no website functionality.

Key Design Features

This project has been designed with an eye to reducing fuel consumption, environmental impacts and improving safety through the following measures:

  • A railway grade that averages less than 1% and curvature that will not exceed 5 degrees.
  • Infrastructure elements designed to modern standards (bridges, culverts and tunnels).
  • A focus on handling non-hazardous goods in a safe and responsible manner with the best available technology.
  • Equipping the system with Positive Train Control and heat detectors to forecast mechanical issues.
  • Fiber optics will be installed for continuous communication and monitoring of the railway's integrity.
This icon has no website functionality.

Project Map

This map is downloadable. You must have adobe acrobat reader to download the map.

Environmental Analysis

A2A Rail will undergo U.S. and Canadian environmental regulatory processes in order to receive the required environmental approvals and permits to construct the railway. Both the U.S. and Canadian processes will involve development and submission of an Environmental Impact Statement (EIS) and engagement with First Peoples, Agencies and interested parties.

 

The A2A Rail EIS process will:

  • Analyze the broad interaction of the project with the environment including the air, land and water, plants and animals, people, economy and communities.
  • Proactively engage and listen to communities to identify the values that would be considered and studied in the EIS.
  • Integrate Traditional Use and Traditional Ecological Knowledge through collaboration with First Peoples to gather quantitative and qualitative data.
  • Partner with technical experts on the routing and design, and to collect scientific data on soils, hydrology, topography and other supporting information.

 

Our steadfast commitment to reducing the project’s environmental footprint and engaging communities surrounding the corridor throughout each step of development will guide the EIS process.

 

U.S. Regulatory Process

The U.S. Federal Permitting Process is a comprehensive procedure that utilizes multiple government agencies and resources to conduct a thorough assessment of any given project’s viability in the United States.

 

Once a Presidential Permit is issued from the White House, A2A Rail will work with the Surface Transportation Board (STB) to begin the STB and NEPA Review processes and apply for the necessary permits and licenses for interstate railroad commerce. During the STB process, A2A Rail will work with a 3rd Party NEPA contractor, as well as various federal, state, and local agencies throughout the U.S. to complete the requirements set forth by the STB and NEPA review to ensure that the project proceeds with the best possible data, science and environmental safeguards in place.

 

Land acquisition for the approximate 200-mile portion in Alaska will come from the State of Alaska lands selected in a joint process with A2A Rail, the Alaska Railroad Corporation, the Department of Natural Resources, and private-land owners along the route.

 

As the STB and NEPA process unfolds and the needed permits are selected, A2A Rail will update the page with the relevant information to the extensive undertakings.

 

Canadian Regulatory Process

The Canadian Federal Permitting Process will begin with an extensive environmental impact assessment (EIA) under Canadian legislation. For this project, environmental assessment processes related to the Yukon, British Columbia and Alberta would also apply. This usually results in a decision by the Federal government in cooperation with Provincial and Territorial regulatory bodies to undertake a coordinated, harmonized EIA process through a Joint Panel.  This decision would be made following submission of a Project Description and a formal determination that an EIA is required for the project.  Following that determination, the government would provide specific guidelines to A2A Rail for the completion of the EIA and would make a decision on the Joint Panel process.

 

A2A Rail will conduct a range of studies to assess the potential effects of the project, based on best possible data, science and considering environmental safeguards.  Participation and relationship building with First Peoples and communities along the proposed railway route will be critical to informing the EIA.  A2A will engage interested parties, Federal, Provincial and Territorial agencies throughout the process.

 

Following a decision on the EIA to approve the project, applications would proceed for the other Federal, Provincial and Territorial authorizations that will be required.

 

As the EIA process proceeds, A2A Rail will update this page with relevant information to support participation in this process.

 

 

This icon has no website functionality.

Recent Progress

This icon has no website functionality.

Master Agreement – Alaska Railroad

A2A Rail has finalized a Master Agreement with the Alaska Railroad that includes cooperation on permitting, selection of the ROW, economic terms, and authorization to operate on their track and to extend several portions of their system. The A2A Rail project will drive higher utilization of Alaska Railroad facilities and will allow it to better serve Alaska’s resource industry while maintaining passenger service.

Finance

This icon has no website functionality.

Project Cost: Approximately $17 Billion CAD (13 Billion USD)

$3 Billion or more will be spent in Alaska.

$4 Billion in steady-state revenues annually are projected to cover costs of operation and capital.

Funding:

To date the finances to develop our railway has been provided by its Founders. As the project proceeds, we expect to attract investment from global investors such as infrastructure funds and Sovereign Wealth groups.

Email Icon - Email the project team at info@a2arail.com

info@a2arail.com

This icon has no website functionality.

1-833-249-2419

This icon has no website functionality.

ALBERTA, CANADA: 2100 Livingston Place, 222 3rd Avenue SW, Calgary, AB T2P 0B4 ALASKA, U.S.A :1029 W. 3rd Avenue, Suite 550, Anchorage, AK 99501

WASHINGTON, D.C., U.S.A: 975 F St NW #900, Washington, D.C. 20004

TOP

This arrow takes you back to the top of the website
This icon has no website functionality.
This icon has no website functionality.
This icon has no website functionality.
This icon has no website functionality.
This map is downloadable. You must have adobe acrobat reader to download the map.
A2A Project Area Map
This icon has no website functionality.
This icon has no website functionality.
This icon has no website functionality.
Email Icon - Email the project team at info@a2arail.com
This icon has no website functionality.
This icon has no website functionality.
This arrow takes you back to the top of the website
This icon has no website functionality.
This icon has no website functionality.
This icon has no website functionality.
This icon has no website functionality.
A2A Project Area Mao with routes
This map is downloadable. You must have adobe acrobat reader to download the map.
This icon has no website functionality.
This icon has no website functionality.
This icon has no website functionality.
Email Icon - Email the project team at info@a2arail.com
This icon has no website functionality.

ALBERTA, CANADA: 2100 Livingston Place, 222 3rd Avenue SW, Calgary, AB T2P 0B4

ALASKA, U.S.A :1029 W. 3rd Avenue, Suite 550, Anchorage, AK 99501

WASHINGTON, D.C., U.S.A: 975 F St NW #900, Washington, D.C. 20004

TOP

This arrow takes you back to the top of the website

EMAIL: info@a2arail.com | PHONE: 1-833-249-2419

ADDRESSES:

ALBERTA, CANADA: 2100 Livingston Place, 222 3rd Avenue SW, Calgary, AB T2P 0B4

ALASKA, U.S.A :1029 W. 3rd Avenue, Suite 550, Anchorage, AK 99501

WASHINGTON, D.C., U.S.A: 975 F St NW #900, Washington, D.C. 20004